cq_1_041

#$&*

Phy 241

Your 'cq_1_04.1' report has been received. Scroll down through the document to see any comments I might have inserted, and my final comment at the end.

** CQ_1_04.1_labelMessages **

A ball is moving at 10 cm/s when clock time is 4 seconds, and at 40 cm/s when clock time is 9 seconds.

Sketch a v vs. t graph and represent these two events by the points (4 sec, 10 cm/s) and (9 s, 40 cm/s).

Sketch a straight line segment between these points.

What are the rise, run and slope of this segment?

answer/question/discussion: ->->->->->->->->->->->-> (start in the next line):

The rise of this segment is 30 cm/sec.

Rise = 40 cm/s - 10 cm/s = 30 cm/s

Run = 9 seconds - 4 seconds = 5 seconds

Rise/Run = slope = 30 cm/s / 5 sec = 6 cm/s /sec

@&

Good.

*@

#$&*

What is the area of the graph beneath this segment?

answer/question/discussion: ->->->->->->->->->->->-> (start in the next line):

The area of the graph beneath this segment is 75 cm/s.

.5 * (30 cm/sec * 5 sec) = 75 cm

@&

The area beneath the graph is a trapezoid, not a triangle.

&#Please see my notes and submit a copy of this document with revisions, comments and/or questions, and mark your insertions with &&&& (please mark each insertion at the beginning and at the end).

Be sure to include the entire document, including my notes.

&#

*@