cq_1_012

Your 'cq_1_01.2' report has been received. Scroll down through the document to see any comments I might have inserted, and my final comment at the end.

** **

The problem:

Answer the following:

How accurately do you think you can measure the time between two events using the TIMER program?

answer/question/discussion:

I think you can measure the time between two events using the Timer program within +/- 0.5 sec.

What is the shortest time interval you think you would be able to measure with reasonable accuracy?

answer/question/discussion:

I think the shortest time interval that you would be able to measure with reasonable accuracy would be 0.5sec.

How does the percent error in timing intervals change as the time between the events gets smaller?

answer/question/discussion:

I believe the percent error in timing intervals increases as the time between events gets smaller.

How accurately are you able to measure the positions of the ball and the pendulum in the initial video?

answer/question/discussion:

Within +/- 1/16th of an inch.

** **

10 min

** **

&#

Good responses. Let me know if you have questions. &#